2013 64′ Azimut Project – Bridgeport Boat Works, Bridgeport, CT
Boat: 2013, 64’ Azimut
Location: Bridgeport Boat Works, Bridgeport, CT
Project Duration: Three weeks
Job Completed: June 2025
Triton Liners recently completed a three week fuel tank rebuild on a 2013 64′ Azimut at Bridgeport Boat Works in Bridgeport, Connecticut. The project involved rebuilding two (2) 500-gallon aluminum saddle tanks after heavy sludge buildup concealed corrosive pitting beneath the surface. It is a good example of why fuel tanks need to be opened, cleaned, and properly evaluated rather than judged by appearances alone. Once these tanks were cleaned, the underlying damage became clear, allowing our team to rebuild them the right way and restore dependable service.
We also want to give a strong recommendation to Bridgeport Boat Works for their excellent service and great people throughout the project. And on a lighter note, the match between the boat and trailer definitely did not go unnoticed.