Offshore Project – Stuart, FL
Boat:
2000 54’ Offshore
Location:
River Forest, Stuart Fl.
Project Duration:
2 weeks
In an extraordinary feat, Triton Liners successfully rebuilt two 350-gallon aluminum fuel tanks that had suffered from internal corrosion. The magnitude of the challenge was amplified by the limited access to the tanks, which would have necessitated cutting holes in the side of the boat or dismantling the salon and removing engines. However, our innovative process offered a superior alternative. By employing our cutting-edge techniques, we revitalized the tanks without resorting to intrusive measures. Our non-invasive approach not only saved time and resources but also ensured the integrity of the boat and minimized disruptions. This project exemplifies our commitment to delivering efficient and effective solutions that surpass conventional methods.
Click on an image below to see full size